该项目包括增加两台20 MGD的泵,通过新的泵控制阀将该站从90 MGD扩展到130 MGD, 管道和相关的附件. It included installation of additional bowls to three existing pumps to increase the pump head; spare bowls for Pumps P-3 and P-4; a 60-inch-diameter suction and discharge header and connections to existing header piping; construction of a new building to house additional pumps and electrical equipment adjacent to the existing building; electrical, 支持抽油机的仪表和SCADA设备, including one soft starter and one variable frequency drive; the addition of one 3750-kVA transformer with pad in the existing electrical yard; and a new 4160-volt switchgear lineup in the electrical room.