This project consisted of the addition of a 90-inch raw water pump station with suction piping and a pump station equipped with two 30-MGD pumps with associated piping and valves; addition of an overhead crane, compressor/dryer and HVAC and electrical room; addition of 72-inch raw water discharge piping; addition of a surge anticipator valve and piping; removal and replacement of existing overhead power; addition of a substation yard, access roads and site grading; and miscellaneous site civil work.